Projects

Projects

SCCP Genenal Infomation

2 February, 2018

GENERAL INTRODUCTION ON SOUTHERN COASTAL CORRIDOR PROJECT a.                   Improvement Requirements The existing road infrastructure does not provide a satisfactory level of service to road users in terms of travel times, transport costs, vehicle weights and dimensions and road safety, and has serious negative environmental impacts on the resident population. The major deficiencies include: (1) […]

Read More

Ho Chi Minh City’s Ring Road No. 4 Construction Project.

2 February, 2018

A. Brief contents of the investment report:   1.      General: The Ho Chi Minh City’s Ring Road No. 4 is one out of four important ring roads in the Vietnam’s expressway network development plan up to 2020 and the vision after 2020, which was approved by the Prime Minister in Decision No. 1734/QD-TTg dated December […]

Read More

Ho Chi Minh City’s Ring Road No. 3 Construction Project.

2 February, 2018

A. Brief contents of the investment report:   1.      General: The Ho Chi Minh City’s Ring Road No. 3 is one out of four important ring roads in the Vietnam’s expressway network development plan up to 2020 and the vision after 2020, which was approved by the Prime Minister in Decision No. 1734/QD-TTg dated December […]

Read More

Vi Thanh – Bac Lieu Project

2 February, 2018

1. Introduction of the Project: Investment and construction of Vi Thanh – Bac Lieu Route shall bring sepcific benefits as follows: – Going through Hau Giang, Kien Giang by the shortest direction to go to provinces of Soc Trang, Bac Lieu and eastern coastal area. – Establish the full worked-out horizontal axis from Xa Xia […]

Read More

The Connector Road from the East-West Avenue project to the Ho Chi Minh –Trung Luong Expressway project

2 February, 2018

1. Introduction of the Project: Constructing a connector road from intersection of the East-West Avenuewith NH1A (An Lac) to the Ho Chi Minh – Trung Luong Expressway according to standards of a urban main axle; Organize reasonable transport to ensure smooth, fast and safe transport; solve traffic jam in the related road networks in the […]

Read More

My Thuan – Can Tho Expressway Project

2 February, 2018

1. Introduction of the Project: Investment and construction of My Thuan – Can Tho Expressway to connect the whole Expressway Route from Ho Chi Minh to Can Tho are urgent demands to: – Reduce transport volume and traffic jam in NH1A (My Thuan- Can Tho Section) due to status of bottle-neck when Trung Luong- My […]

Read More

Ben Luc – Hiep Phuoc component project (Belonging to the Ho Chi Minh City Ring Road Project No.4)

2 February, 2018

1. Introduction of the Project: Ben Luc – Hiep PhuocRoute is a section under the Ring Road Project No.4 of Ho Chi Minh City (HCMC) and it locates on the HCMC and LongAnhProvince. This is a project that connects quickly industrial zone and Hiep Phuoc port complex with provinces of Mekong River Delta across HCM […]

Read More

Tan Van – Nhon Trach Component Project under the Ho Chi Minh City Ring Road Project No.3

2 February, 2018

1. Introduction of the Project: Tan Van – Nhon Trach Route is a section under the Ring Road Project No.3 of Ho Chi Minh City (HCMC) and it belongs to the center economic region of the South. This is the shortest section which connects Nhon Trach City to the International Transportation System through the Trans […]

Read More

SCCP Component 2

2 February, 2018

THE COMPONENT PROJECT No. 2: CONSTRUCTION OF SECTION FROM MINH LUONG TO THUBAY UNDER SOUTHERN COASTAL CORRIDOR PROJECT: 1. THE PROJECT’S NAME: – Total Investment Cost: 989,125 billion VND in accordance with the Decision Ref. No. 386/QD-BGTVT dated 23 February 2009 of Ministry of Transport (MOT). – Cost estimate for civil works: 867,855,627,000VNĐ in accordance […]

Read More

SCCP Component 1

2 February, 2018

The Greater Mekong Subregion Southern Coastal Corridor (GMS-SCC) is a road corridor running along the Gulf of Thailand coast from Bangkok through Thailand, Cambodia and Viet Nam to Ca Mau city in the south. The GMS-SCC’s length on existing roads is approximately 924km. The Component Project 1: Xa Xia – Ha Tien section and Thu […]

Read More