Day: February 2, 2018

My Thuan – Can Tho Expressway Project

2 February, 2018

1. Introduction of the Project: Investment and construction of My Thuan – Can Tho Expressway to connect the whole Expressway Route from Ho Chi Minh to Can Tho are urgent demands to: – Reduce transport volume and traffic jam in NH1A (My Thuan- Can Tho Section) due to status of bottle-neck when Trung Luong- My […]

Read More

Ben Luc – Hiep Phuoc component project (Belonging to the Ho Chi Minh City Ring Road Project No.4)

2 February, 2018

1. Introduction of the Project: Ben Luc – Hiep PhuocRoute is a section under the Ring Road Project No.4 of Ho Chi Minh City (HCMC) and it locates on the HCMC and LongAnhProvince. This is a project that connects quickly industrial zone and Hiep Phuoc port complex with provinces of Mekong River Delta across HCM […]

Read More

Tan Van – Nhon Trach Component Project under the Ho Chi Minh City Ring Road Project No.3

2 February, 2018

1. Introduction of the Project: Tan Van – Nhon Trach Route is a section under the Ring Road Project No.3 of Ho Chi Minh City (HCMC) and it belongs to the center economic region of the South. This is the shortest section which connects Nhon Trach City to the International Transportation System through the Trans […]

Read More

SCCP Component 2

2 February, 2018

THE COMPONENT PROJECT No. 2: CONSTRUCTION OF SECTION FROM MINH LUONG TO THUBAY UNDER SOUTHERN COASTAL CORRIDOR PROJECT: 1. THE PROJECT’S NAME: – Total Investment Cost: 989,125 billion VND in accordance with the Decision Ref. No. 386/QD-BGTVT dated 23 February 2009 of Ministry of Transport (MOT). – Cost estimate for civil works: 867,855,627,000VNĐ in accordance […]

Read More

SCCP Component 1

2 February, 2018

The Greater Mekong Subregion Southern Coastal Corridor (GMS-SCC) is a road corridor running along the Gulf of Thailand coast from Bangkok through Thailand, Cambodia and Viet Nam to Ca Mau city in the south. The GMS-SCC’s length on existing roads is approximately 924km. The Component Project 1: Xa Xia – Ha Tien section and Thu […]

Read More

Cao Lanh Bridge

2 February, 2018

The Cuu Long delta area has experienced a the Central Mekong Delta Connectivity Project The project has been developed with the support of the Asian Development Bank and the Government of Australia who financed the Project Preparation Technical Assistance (PPTA) grant. Purpose of the grant was to develop the project to a level suitable for […]

Read More